A+ A A-

Articles

Fabrication Yard

The Snake Island Fabrication Yard in Lagos State is being built by Kaztec Engineering Limited, with Addax Petroleum Development Company as her technical partner. It is the first fully owned indigenous fabrication yard in Nigeria.

The Yard after completion would be a one-stop-place for fabrication of offshore platforms, large offshore modules, FPSO refurbishment & new build, jackets. It would also provide facilities like pipe mill, pipe coating, dry and floating dock, logistics, supply base and skills development and satisfaction of all the project delivery needs of oil and gas companies doing business in Nigeria, the Gulf of Guinea and West Africa.

What We Do

 

Offshore

•    Fabrication and installation of walk way bridges, Wellhead Jackets, Decks, Topsides    and Modules.

•    Construction, steel fabrication and erection of new Mobile Offshore Drilling unit and    Shipbuilding.

•    Piping fabrication and installation.

•    Submarine Pipelaying, Shore Pull, Riser Installation, Subsea Tie-In, echanical Anchoring, hookups and commisioning.

•    Structural work comprising of steel modules and assemblies, and painting.

•    Turnkey repairs to spud-can, mud-mats, shock foundations, and jack-up rigs using    semi-submersibles and cofferdams techniques and corrosion protection services.

•    Replacement of cranes, FG skids, chlorinators, deluge systems, and other equipment.

•    Electrical and instrumentation works.

•    Heavy Equipment Installation.

 

Onshore

•    Turnkey projects for revamp of plant piping and structural works, including    pre- engineering surveys, preparation of Isometric and bill of materials, transportation,    prefabrication of spools and supports and structures at site, storage of equipment and materials, erection, hook up and commissioning.

•    Anti-corrosion Coating (Coal-Tar, FBE, PE & PP) of Linepipes.

•    Concrete Weight Coating of Linepipes.

•    Onshore Pipelaying and Onsite Works.

 

Our Commitment to Safety

 Safety First- Safety in All We Do

Kaztec is committed to delivering its services, giving high priority to Safety, Protection of the Environment and Quality. The resultant of this commitment drove the Company to achieve a total of 1,537,407 Project Man-hours with Lost Time Incident (LTI).

Safety Policy

Prevent injury to personnel and damage to assets and facilities

Prevent pollution to the environment

Provide adequate resources to aid in assessing all identified risk and establish appropriate safeguard

 Safety Objectives

Our objective is zero accident tolerance through;

Promotion of safety consciousness amongst employees and sub-contractors

Effective safety training to promote personnel skills and competence

Implementation of innovative measures to continually improve safety practices

Provision of best industry practices in design construction and maintenance of equipment and facilities

Policies

Quality Policy

The policy of Kaztec Engineering Limited is to always meet the customer as well as statutory and regulatory authority requirements and expectations through the development and maintenance of Safety and Quality Management System in conformity with International Standards and to continuously improve effectiveness. This management system shall be the means through which the company’s Mission, Policies and Quality objectives will be achieved.

HSE Policy (Safety and Environment Protection Policy)

It is policy of Kaztec Engineering Limited to provide safe and environmentally friendly services at all times. The Objectives of the policy are to prevent death or injury to personnel, damage to Facilities, Fabrication yards and property as well as preventing the pollution of the environment. To achieve this objective, Kaztec’s Management is committed to provide the necessary training and resources for meeting its objectives, and continuously improving the safety record of the Company to meet local and international safety standards. The employees in turn are expected to exercise self-discipline, be safety conscious, and to take necessary steps to prevent injury to themselves and others.

We at Kaztec Engineering Limited acknowledge that personnel are our biggest assets and therefore place emphasis on their welfare and safety. We will implement this policy and maintain it in purpose and intent at all levels of the organization, be it offshore/onboard or ashore.

Drug and Alcohol Policy

The Company believes in promoting, providing and maintaining a safe, hazard free working environment, to protect employee health and client / Company’s property and to promote safe and efficient operations.

To achieve this objective, the possession, use and consumption of drugs and alcohol on any marine vessel, offshore installation or work site operated/owned by the Company is strictly prohibited.

 

Who We Are

Kaztec Engineering Limited (Kaztec) is one of the fastest-growing engineering, procurement, construction and installation (EPCI) companies in Nigeria. Established in 2005, the company has already completed several projects. Kaztec’s breakthrough project came in 2007, when it was awarded the engineering, procurement and construction contract by the Niger Delta Power Holding Company (NDPHC) to construct a 24-inch diameter, 107-kilometer long gas pipeline to convey gas to a gas fired power plant in Calabar from an offshore gas producing facility in Adanga. Based on its successful performance, Kaztec secured another contract from NDPHC in 2009, to rehabilitate and upgrade its gas metering facilities and perform integrity assessment tests on some of its existing gas pipelines.  

In 2010, Kaztec was awarded a contract; TB-1921, by Addax Petroleum Development Nigeria Limited (Addax) to install subsea pipelines and topsides on Oil Mining Lease 123, offshore Calabar. Installing pipelines, risers and other subsea equipment and connecting them to newly-installed platforms and topside facilities required the full support of Kaztec’s fleet, which currently include the Ekulo Cheyenne, Ekulo Tornado, Ekulo Spirit and Ekulo Explorer. Kaztec also utilized remotely operated vehicles and air and saturation diving support in its execution of TB-1921.  

Kaztec completed Campaign 2 of the TB-1921 contract in 2011 and started working on Campaign 3 immediately afterwards.  By mid-2012, Kaztec and Addax had agreed to work together under an alliance framework based on the success of both Campaigns. The alliance framework entails the collaboration of personnel from Kaztec and Addax in the performance of the engineering, procurement, construction and installation, as opposed to the standard client-contractor relationship. This model ensures that Kaztec continues to develop its capacity as a full EPCI contractor and that TB-1921 projects are completed on-time and below budget. 

Kaztec has received ISO 9001:2008 Certification and is currently a member of the International Institute of Risk and Safety Management (IIRSM), International Marine Contractors Association (IMCA) and Pipeline Professional’s Association of Nigeria (PLAN). 

Kaztec is currently developing an oil and gas industrial facility on 531-hectares of land in Snake Island, Lagos. This facility is being developed in stages and when completed will include a fabrication yard, pipe coating facility, pipe mill, engineering base, office space, residential buildings, helipad, among other structures. The company is also acquiring more vessels to support its offshore engineering capabilities. 

Kaztec is a subsidiary of the Chrome Group; a conglomerate with many subsidiaries operating in various sectors of the oil and gas industry, such as exploration and production, servicing, petroleum and petroleum products trading, logistics and inspection services. 

 

More Articles...

  1. About Us

About Kaztec

Kaztec Engineering Limited is a subsidiary of the Chrome Group.

More info

Copyright © Kaztec Engineering Ltd |. All rights reserved.